+ 65 6265 0666
  • News Centre
    • Press Releases
    • Feature Stories
    • Port Circulars
    • Corporate Social Responsibility
  • JP Connectivity
  • Pass Application
  • JP-Online
  • JEMS
Jurong PortJurong PortJurong PortJurong Port
  • Why Us
  • Multipurpose Terminals
    • General and Bulk Cargo
      • Project Logistics Hub & Projects Showcase
      • Offshore Marine Centres
      • General / Break Bulk
      • Ro/Ro
      • Dry and Liquid Bulk
    • CONSTRUCTION
      • RMC Ecosystem
      • Cement Terminal
      • Steel Terminal
    • LIGHTERAGE
      • Lighter Terminals
    • Containers
      • Conventional Containers
  • Energy Terminals
    • Jurong Port
      Tank Terminals
    • Jurong Port
      Universal Terminal
  • About Us
    • Overview
    • International Presence
      • China
        • Rizhao Port Jurong Terminals (Rizhao)
        • SDIC Jurong Yangpu Port (Hainan)
      • Indonesia
        • Marunda Center Terminal (Jakarta)
    • Awards & Milestones
    • Leadership
    • Business Partnerships & Licensed Stevedoring Companies
    • Port Layout
    • Environmental, Health & Safety
    • Sustainability
    • Port Rules & Regulations
    • Whistleblowing Policy
  • Join Us
    • Job Opportunities
    • Internship and Scholarship
    • JP Academy
  • Contact Us
    • Contacts & Locations
    • Enquiries
  • FAQs

FAQs

Operations

  • Safety & Security
  • Accounts
  • Passes & Permits
  • Businesses / Services
  • Storage
  • Operations
  • Documentation
  • Invoicing & Payments
  • Stowage Requirements
  • Mobile Apps
Home FAQs Operations

Berth Application

Berths

e

How many berths are available in Jurong Port?

There are 28 berths and 2 ramps available for berthing of vessels. These berths are designed to accommodate vessels for General Cargo, Dry Bulk Cargo, Container and Roll-On-Roll-Off operations.

e

What is the maximum permissible draft allowed for vessel?

The maximum permissible draft is 15.7 metres.

e

What are the requirements for the application of berth in Jurong Port?

The company requesting for berth must be an Agent with both Credit and JP-Online accounts with Jurong Port.

The submission of the application can only be done using JP-Online. The Agent must ensure that the Credit Account is active and the vessel is registered in JP’s database before an application can be created and submitted by the following steps:

(1) Login to JPOM

(2) Look for “Vessel”

(3) Select “Berth Application”

(4) Select “Terminal (GB – Conventional Terminal)”

(5) Select Abbreviated / Full Vessel Name

(6) Key in vessel name & voyage in/out

(7) Click “Add”

(8) Key in Berth Time Required (BTR) of Berth Application and other information

(9) Click “Submit”

e

What should be submitted for berth application?

The Agent should ensure that the arriving vessel has a previous vessel record registered with Jurong Port (JP).

For vessel without a JP record:

The agent must first register the vessel with Maritime and Port Authority (MPA). A vessel ID will be issued by MPA.

With the vessel ID, the Agent will submit the vessel submission in JPOM.

Upon receiving the vessel submission request, JP Berthing department will vet the vessel details and the attached documents. Application will be approved if everything is in order.

With the vessel record created, the Agent can proceed to submit the Berth application.

e

Is line-towed barge allowed to vacate berth after sunset?

There is a prohibition of line-towed barges at night by the Martime and Port Authority (MPA) where by vessels/barges (not self-steered) are not allowed to vacate berth after 1900 hours even after the operation is completed. Line-towed barges are prohibited from 1900 hours to 0630 hours the following morning in the Western Sector.

During submission of the Berth application, the Agent must indicate that the vessel is line-towed.

e

Is special dockage applicable for line-towed vessel/barge?

A special dockage (line-towed barge) of $10.00 per hour is applicable to all line-towed vessel/barge (IF indicated in berth application during submission) that berth at JP.  This special provision is only available from from 1745 hours to 0630 hours OR from the last activity time (after 1645hours with 1 hour grace period) to 0630 hours.

Duration Required for Submission

e

What is the minimum period for submission of berth application?

For cement vessels, reservation window can be booked 40 days before vessel Berth Time Required (BTR) in the Cement Vessel Reservation System (CVRS).

Berth application cannot be submitted. Berth application conversion will open 5 working days and close 3 working days before vessel BTR.

  • For General Cargo vessels, berth application must be submitted at least 2 working days before the berth is required
  • For Container Vessels berth application require 3 working days before the berth is required
e

What is the minimum time-frame to amend berth application?

Berth amendment can be done 1hr before the vessel berth (ETB). All amendment must be done 24 hours or more before Berth Time Required (BTR)/ETB (whichever is later) of the vessel. Berth amendment made after the expiry of the first 24 hours before BTR/ETB (whichever is later) of the vessel will be billed a late amendment charge of $100.00.

All berth amendment changes should be submitted in the JPOM under Berth Application, BTR Amendment Requests.

(1) Login to JPOM

(2) Select “Vessel”

(3) Select “Berth Application”

(4) Select “BTR Amendment Requests”

(5) Select Vessel

(6) Amend (create the amendment)

JP Berthing department on receipt of the request will do the necessary changes and berth applicant will be notified of the change by SMS (Short Message Service).

Late Submission/ Changes/ Cancellation of Berth Application

e

What is the penalty fee for vessel that berths after Estimated Time of Berthing (ETB)?

Late arrival charges shall be levied 15 minutes after ETB to the actual time of berthing.

  • For the 1st 15 minutes after ETB – $100.00
  • For every subsequent 5 minutes or part thereof – $35.00
  • For late application/amendment/cancellation – $100.00

The above charges are based on per occasion basis.

e

How is overstay dockage calculated?

All other vessels except cement vessel berthing at Jurong Port are given 1-hour allowance after the last activity time to depart.
i)  Cement vessel is given 1 hour 30 minutes allowance
ii) Other bulk vessel is given 2 hours allowance

When vessel port stay exceeds the allowed grace period, overstay dockage will be billed.


Overstay dockage is calculated as below:

 Per metre or part thereof per nearest quarter hour

  • First 2 hours – $1.00
  • Next 2 hours – $2.00
  • 4 hours onwards – $4.00

Mooring Gang

e

Will a mooring gang be provided for the berthing of vessel?

With the exception of Landing Crafts calling at our R1/R2 ramps which do not required fastening, Jurong Port will provide the mooring manpower for the berthing and unberthing of all vessels here.

e

What is the operating time of the mooring gang?

Our mooring gang operates 24/7.

Pilotage

E

Does Jurong Port arrange pilotage for vessel?

Jurong Port does not arrange for vessel calling at Conventional Terminal. The Agent is to make the necessary arrangement for pilotage with a minimum 4 hours before Estimated Time of Unberthing. This is a requirement by the pilot office for a vessel with DWT of ≥2000 tonnes.

Any charges relating to the pilot booking is for the account of Agent.

Supply of Water & Bunkering

e

How should the request be made for water and bunker supply for vessels calling at Jurong Port?

Request for water and bunker should be indicated in the berth application before submission.

Water
Quantity and date/time must be indicated and supply would be made on vessel berthing.

Bunker
The vessel charterer should provide details of the bunker supply company and the duration as well as the quantity that the vessel would be taking.
The Ship Owner will have to make the arrangement with a bunker company for the bunker to be supplied while the vessel is at berth.

e

Is there any penalty charge for the late request for water supply?

For all late request of less than 24hrs before the service, a penalty fee of $100.00 is applicable.

e

Is bunker supply allowed while cargo operation is in progress?

Bunker supplies by road tanker or vessel is allowed in Jurong Port while vessel is alongside.

For supply by road tankers, approval should be obtained from the Workplace Safety Health Department.

For both modes, supply is strictly prohibited when cargo operation is in progress. Supply can continue after completion of cargo operation.

Any port stays beyond the estimated time of unberthing if deemed to be without good reason may be subjected to overstay dockage.

Schemes

Available Schemes

E

What are the different schemes available for vessel berth application?

Licensed Contractors

Stevedoring Contractors List

E

Downloadable list of Stevedoring Contractors in PDF

Click here to download the Stevedoring Contractors List.

Mobile Cranes Contractors

E

What is the application process for Licensed Mobile Crane Contractor?

The licence is given to crane companies to operate in the port. The licence is categorised based on the area of operation. The contract period is 1 year and it is renewable on expiry but subject to JP Operations Department / Workplace Safety Health(WSH) Department for approval.

To qualify for the crane operator licence, the crane company is to write to WSH to register for the licence. WSH will inform the company to submit the application together with the company’s details.

On approval, the successful crane company is required to provide a Banker Guarantee.

The company is also to purchase the Mechanical Equipment sticker. This sticker allows for the equipment to operate in the port.


(1) Mobile Crane License is granted to crane company to operate their registered crane (s) for crane operation in 37 Jurong Port only. The License is categorised as Class A, B & C (subject to BizSAFE Level Certification). The license class is based on the number of mobile cranes allowed to register with JP.

(2) Mobile Crane License is implemented by WSH only. The contract period is 1 year.  WSH shall email invite all Mobile Crane Company to apply and register for the Mobile Crane License for the annual licensing (commencing on 1 Jun of each year). To qualify for the crane operator licence, the crane company is to submit the application together with the company’s details and fulfilment of the license criteria. On approval, the successful crane company is required to provide a Banker Guarantee.

(3) Successful Mobile Crane Company is issued with a Crane Pass for each registered crane, which allows for the crane to operate in the port. An annual Administrative Fee of $25 is charged per mobile crane registered.

Have we resolved your concern?  If not, let us help you.

BACK TO FAQS

Jurong Port

Headquartered in Singapore, Jurong Port is a leading international multipurpose port operator handling general, bulk and containerised cargo. Jurong Port began operations in 1965 as a general and bulk cargo port, serving the development needs of Singapore’s Jurong industrial estate. Today, its main gateway terminal in Singapore welcomes more than 15,000 vessels each year from both the region and internationally.

JURONG PORT

  • 37 Jurong Port Road Singapore 619110
  • +65 6265 0666
  • Enquiry Form
PENJURU LIGHTER TERMINAL
  • 42G Penjuru Road

    Singapore 609151
  • +65 6413 9614
  • +65 6316 2072
MARINA SOUTH WHARVES
  • 71 Marina Coastal Drive
    Singapore 018946
  • +65 6413 9617
  • +65 6604 9403
OFFSHORE MARINE CENTRE
  • 101 Tuas South Ave 8
    Singapore 637423
  • +65 6660 9057
  • PLHComm@jp.com.sg
JURONG PORT ACADEMY
  • Jurong Port Admin Building
    37 Jurong Port Road
    Singapore 619110
  • jpacademy@jp.com.sg
Copyright © 2025 Jurong Port Pte Ltd. All Rights Reserved. Terms of Use | Privacy Statement
  • Home
  • Why Us
  • Our Expertise
    • Construction Ecosystems
      • RMC Ecosystem
      • Cement Terminal
      • Steel Terminal
    • Lighterage Ecosystem
      • Lighter Terminals
    • Energy Ecosystem
      • Jurong Port
        Tank Terminals
      • Jurong Port
        Universal Terminal
    • Containers
      • Conventional Containers
    • Other General and Bulk Cargo
      • Project Logistics Hub (& Projects Showcase)
      • Offshore Marine Centres
      • General / Break Bulk
      • Ro/Ro
      • Dry and Liquid Bulk
  • International Presence
    • China
      • Rizhao Port Jurong Terminal (Rizhao)
      • SDIC Jurong Yangpu Port (Hainan)
    • Indonesia
      • Marunda Center Terminal (Jakarta)
  • About Us
    • Overview
    • Awards & Milestones
    • Leadership
    • Business Partnerships
    • Port Layout
    • Environmental, Health & Safety
    • Sustainability
    • Port Rules & Regulations
    • Whistle Blowing Policies
  • Join Us
    • Job Opportunities
    • Internship and Scholarship
    • JP Academy
  • Contact Us
    • Contacts & Locations
    • Enquiries
  • FAQs
  • News Centre
    • Press Releases
    • Feature Stories
    • Port Circulars
    • Corporate Social Responsibility
  • JP Connectivity
  • Pass Application
  • JP Online
  • JEMS
Jurong Port