image03 image04 image05


Main Port

Jurong Port began operations in 1965 as a general and bulk cargo port, serving the development needs of Singapore’s Jurong industrial estate. Today, its main gateway terminal in Singapore welcomes more than 17,000 vessels each year from both the region and internationally.

Overview

The main terminal has 32 berths capable of serving the varied needs of the maritime industry. Its berths, with drafts ranging from 5 to 16 metres, can accommodate vessels of up to 150,000 deadweight tonnes. Within the terminal, there are 174,000 square metres of warehouse facilities and one of the largest common-user cement terminals in the world.

Multi-purpose facilities at the main terminal enable the loading and unloading of:

    • Dry and liquid bulk cargo

 

    • General cargo, including heavy-lift project cargo

 

  • Containerised cargo

↑ Back to Top